This is a new generation of epoxy adhesive specifically developed for the “spot-hanging” (dot bonding) dry-paste installation process. It is designed to meet the requirements of paving indoor ceramic large slabs and rock slabs, offering a high-performance alternative to traditional wet installation methods.
Surface Preparation: Ensure the bonding surface is dry, dust-free, oil-free, and firm.
Smooth surfaces: Must be roughened before application.
Metal surfaces: Must be thoroughly cleaned of rust.
Mixing: Mix the adhesive components thoroughly. Do not mix the glue directly on the bonding surface; use a separate mixing board or container.
Temperature Control: If the ambient temperature is below 5°C, the bonding site can be heated (heating temperature must not exceed 65°C).[6]
| Main Composition | Epoxy resin |
|---|---|
| Color | Pure White |
| Specification | 1L, 5L, 10L |
| Working Time | 2-10min |
| Curing Time | 4~12 Hours |
| Dry Time | Less than 10min |
| Storage | 12 monthes if stored in cool places |