<trp-post-container data-trp-post-id='1971'>When to Reorder Marble Adhesive: A Stock Planning Guide for Distributors

Set a reorder point for each marble adhesive SKU, then size the order around delivery dates and the lot's remaining selling window.

Tác giả: KEDAĐã xuất bản
Three closed metal tins on a warehouse bench beside a clipboard and a marble offcut.

Reorder a marble adhesive SKU when the stock you can sell, plus confirmed arrivals and minus customer commitments, falls to the amount you expect to sell before the next replenishment arrives, plus a buffer. Then make a separate decision about how much to buy: a SKU can be due for replenishment even when the supplier’s minimum order is more than you can sell within the lot’s remaining shelf life.

This guide is for distributors replenishing an established range of knife-grade polyester marble adhesive. Plan by grade, color, and pack size. A surplus of 1 L white tins does not cover a shortage of 4 L white tins unless customers have agreed to the substitution.

1. Set the reorder point for each SKU

Reorder point = forecast demand during replenishment lead time + safety stock.

Start with normal weekly demand for the specific SKU. Review shipped orders alongside backorders and missed sales during stockouts, so a week with no stock does not look like a week with no demand. Separate a one-off project order from routine sales. For a color that only sells when a project is confirmed, buying against a customer order may make more sense than keeping a permanent buffer.

Measure lead time from placing the order to having stock released and ready to sell. Include the supplier’s preparation time, freight, clearance where applicable, warehouse receipt, and inspection. A dispatch estimate is only one part of that interval. Base the buffer on the delays and demand swings you have seen, and review it when the shipping route or sales pattern changes.

2. Check sellable stock and the dates on open orders

Count only stock you can release for sale. Exclude damaged tins, lots on hold, and packs missing the required matched hardener. Check that short-dated lots can still meet customer requirements after delivery. The stock rotation guide covers how to decide which eligible lot to issue first.

Add confirmed inbound units and subtract open customer commitments. When you compare that figure with forecast demand, count each customer order once: if you have already deducted it from available stock, leave it out of the remaining forecast. Then check the dates week by week. A shipment due in week five cannot fill a gap in week three, even if the total on-order quantity looks healthy.

Worked example: 4 L white marble adhesive

The figures below illustrate the calculation. They are not KEDA lead times, order minimums, or shelf-life specifications.

InputExample
Forecast demand, excluding orders already committed18 tins per week
Order-to-release lead time5 weeks
Safety stock24 tins
Reorder point18 × 5 + 24 = 114 tins
Sellable stock on hand72 tins
Confirmed inbound stock, due at the end of week 3+36 tins
Open customer commitments−12 tins
Stock position96 tins

Decision: start the replenishment order. The stock position is below the 114-tin trigger. There is also a timing issue to watch: if the 12 committed tins ship now, 60 remain. Three weeks of forecast sales use 54, leaving just six tins before the scheduled receipt. If the shipment slips, confirm whether it can be expedited and check which customer orders are due first. A new routine purchase order will not close that immediate gap.

3. Check how much you can sell before the last acceptable ship date

Ask for the lot’s remaining shelf life at expected receipt and check how much life your customers require at delivery. Work backward from that requirement to find the last date you can dispatch the stock. Forecast sales within that window, then subtract the older stock you expect to sell first.

For example, if the incoming lot would have only six weeks to ship after receipt, demand of 18 tins a week supports about 108 tins in that window, before allowing for older stock. If the quoted minimum is 240 tins, the reorder signal is still valid, but that quantity is too high for the forecast. Ask whether a smaller release, staggered shipments with separately agreed lot dates, or a mixed order is available. If those options do not fit, consider stocking the faster-moving grades and supplying slow colors against confirmed orders.

On your next stock review, record five things for each SKU: weekly demand, order-to-release lead time, reorder point, the next date stock may run short, and the quantity you can sell within the incoming lot’s selling window. The reorder point tells you when to act. The dated stock review and selling window tell you what to buy.

If you’re planning a repeat order, send KEDA your replenishment requirements. Include the grade, color, pack size, target quantity, destination, required delivery date, and minimum remaining shelf life at delivery. Ask for a confirmed shipment schedule and the applicable packing and minimum order terms.

LET’S TALK ABOUT YOUR REQUIREMENTS

Looking for the right adhesive
for your market?

Tell us your product interests, application and expected quantity. We work with overseas distributors and serve fabricators and contractors whose orders meet the minimum quantity.