Decide what can be issued before deciding what to pick first. A stone adhesive kit is available only when the grade and all required components are identifiable, their dates and condition meet the supplier’s requirements, and the stock has a documented storage history. Among eligible lots of the same SKU, pick the one that expires first and still meets the customer’s remaining shelf-life requirement.
Receive each component into the same stock record
Check the actual labels and safety data sheets (SDS) for the grade received. A knife-grade polyester marble adhesive has a matched hardener; a two-component structural epoxy has an approved Part A and Part B. Record the labels for both. Linking their records does not mean storing them side by side; follow the storage and separation instructions for each component.
| At receiving | What to record | When to hold |
|---|---|---|
| Product and components | Grade, SKU, quantity, and each component’s batch or lot number | Component is missing, unidentified, or does not match the supplied kit |
| Dates | Receipt date and confirmed expiry for each component; keep the original label evidence | Expiry is missing, illegible, or cannot be established from the supplier’s dating method |
| Condition and storage | Container condition, seal, location, and any known storage or transit exception | Damage, leakage, missing seal, or storage outside the supplied requirements |
Keep the receipt date separate from the production, expiry, and first-opened dates. If the supplier states a duration instead of a use-by date, apply it only from the specified starting date and under the stated conditions. Ask for clarification when either is missing. In the stock system, distinguish Available from Hold so a questioned lot stays out of the picking list.
Follow FEFO for stock that can actually ship
First expiry, first out (FEFO) gives priority to the earliest confirmed expiry among eligible stock. For a kit, use the earliest applicable component expiry as the limit when ranking complete eligible kits. A later expiry on the base or Part A cannot extend the usable period of its companion component.
For example, suppose the same SKU has one eligible kit expiring in March and another expiring in January. Pick January if the kit still meets the customer’s agreed remaining-life requirement at the agreed point, such as delivery. If transit and the customer’s requirement rule January out, pick March for that order and keep the January lot identifiable for a suitable order. Held stock never takes priority over eligible stock.
Show the lot and approved quantity on the pick list. Check them against the labels at dispatch and keep the batch-to-customer record. Before reordering, separate quantities that are ready to ship from stock on hold, opened workshop containers, and kits that cannot meet the sales window.
Track opened workshop stock separately
Record the first-opened date and keep the base and companion component identifiable. Exclude opened workshop stock from sealed sales inventory. Follow the marble adhesive shelf-life guide for the checks that determine whether a particular can can return to use.
Close a stock exception before issuing material
Record the affected lots and quantities, what happened, when it happened, and which component was exposed. Include label photos, the best available temperature or transit record where relevant, and whether any affected stock has already shipped. Keep observed facts separate from gaps in the record. Entre em contato com a KEDA with the evidence and intended use for a product-specific decision, then record the disposition in the same stock record.
For replenishment, use the distributor inquiry to confirm the grades, components, pack sizes, and remaining shelf life needed for the order. Give the workshop the current use instructions when issuing stock; our marble adhesive guide covers the separate handling and finishing decisions.