Build a first stone adhesive order around customers you can identify, applications you can support and stock you can reasonably move. The opening shipment should establish a useful selling range and produce information for the next purchase.

Start with a short list of exact products, colors and pack sizes. Give each line a reason to exist: committed customer demand, an agreed evaluation or a justified opening-stock allowance. Keep those reasons visible when the quotation and shipping proposal arrive.

This guide explains how to turn customer conversations into a reviewable first-order plan. It provides a working method rather than a universal container mix, minimum quantity or sales forecast.

1. Separate Customer Commitments from Early Interest

List the customers or customer groups behind the proposed order. Record their actual work, current purchasing unit, preferred packaging and next decision. A fabricator asking for a trial and a customer placing an order should occupy different positions in the plan.

Demand positionEvidence to recordFirst-order action
Confirmed requirementExact item, quantity, application and required dateAllocate supply against the stated commitment
Evaluation in progressSample identity, trial task, reviewer and next decisionPlan the agreed evaluation quantity separately
Qualified interestCustomer application and unresolved purchasing questionsFollow up before treating interest as firm demand
Possible future rangeMarket idea without an identified buying requirementKeep on the development list for later review

Use the customer’s own buying unit where possible. “A few boxes each month” needs clarification if the boxes contain different pack sizes or matched components. Ask what was purchased, what it was used for and whether the stated consumption is representative.

Give every open opportunity a next action. That might be a sample review, a packaging confirmation or a purchase discussion. An unconfirmed inquiry can justify follow-up without automatically justifying warehouse stock.

Staged planning cards labeled Confirmed and Trial help distinguish committed demand from evaluation activity.

Fictional demand-planning scene. Card counts and tray sizes are not recommended order allocations.

The International Trade Administration's market research guide outlines how to check demand and competition before committing to a market. For an opening order, pair that broader research with your own customers' repeat requests, planned trials, and confirmed jobs.

2. Choose Product Families by the Work Your Customers Do

Begin with a product family that fits the customer applications already identified. Add another family when there is a clear selling and support reason, rather than simply making the opening range look complete.

KEDA Knife Grade Polyester Marble Adhesive is the relevant discussion for suitable nonstructural stone fabrication and local repair. KEDA 2-Component Epoxy Structural Adhesive belongs to a separate discussion about designated rigid bonding and stone-installation interfaces.

KEDA’s stone fabrication and repair guidance helps connect workshop inquiries with joints, edge assembly and filling tasks. Keep those customer needs distinct from project-specific installation selection.

Write a short application description beside each proposed family. Sales staff should be able to explain who it is for, which details to ask about and when to refer the inquiry for technical review.

Complementary sealants, stone-care products or installation materials can be considered when they serve the same customer base. Each addition still needs its own product identity, application review and supply confirmation. A mixed shipment is a purchasing arrangement, not evidence that different products are interchangeable.

3. Narrow the Opening Color and Pack Assortment

For each selected family, connect color and capacity with actual customer use. KEDA’s knife-grade polyester range lists Black, White, Beige and Transparent in 1 L, 4 L and 20 L capacities. Available choices provide options; they do not require a distributor to stock every combination.

Ask which stone and joint appearance customers need, and approve representative finished samples. Keep the accepted base color and any permitted tinting instructions connected to the actual product.

Use KEDA’s guide to evaluating marble adhesive samples before a bulk order to organize that decision. A sample accepted for one workshop detail does not resolve every other material or application.

Choose pack sizes around the way customers purchase and use the supplied material. Ask about workshop throughput, handling, storage and the practical use of an opened container. A larger pack’s unit price is only one part of that choice.

Before adding a color-capacity combination, identify its first likely buyers and the evidence behind the quantity. Where that answer is weak, keep the option available for a later order discussion instead of giving it the same allocation as an established requirement.

Editorial stone-and-color reference study supports discussing a limited opening assortment.

Paper color references are editorial props, not cured adhesive samples, exact KEDA color standards or approved stock recommendations.

4. Define the Purchasing Unit for Every Order Line

Make each line understandable without an informal explanation. Product family alone is insufficient when colors, capacities, hardeners or A/B configurations differ.

Order-line fieldWhat to define
Product identityExact name, supplied grade and required version
Color and capacitySelected color and the capacity of each supplied component
Purchasing unitWhether the quoted unit is one container, a defined set or a carton
Matched componentsWhat hardener or A/B components are included and how they are identified
Packing conversionConfirmed containers or sets per carton and relevant packing information
Quantity and destinationNumber of defined units, delivery destination and required availability

For structural epoxy, define which Part A and Part B containers make up one quoted set. KEDA’s specified system uses A:B 1:1 by volume, not assumed equal weights. Pack quantity, component volume and shipping weight are separate fields.

For polyester adhesive, confirm the matched hardener supplied with the selected order configuration. Keep its actual dosing instruction separate from any quantity used for quotation or packing.

Use the same unit definitions in the quotation, order confirmation and receiving record. Resolve conversions before comparing totals; otherwise, two suppliers’ “ten units” may describe different usable quantities.

5. Give Every Quantity a Stated Basis

Choose a planning period that relates to customer demand, expected stock availability and the next purchasing decision. Record the dates behind it. A supplier’s production schedule and the time until goods are available to customers are different parts of the plan.

For each exact item, separate committed supply, agreed demonstrations and the opening stock you propose to sell. Any additional allowance should have a reason, an owner and a review point.

For arithmetic only, suppose one defined product-color-pack line has eight packs committed to customers and two packs allocated to agreed demonstrations. With no usable stock or confirmed incoming supply, these identified allocations total ten packs. This is a planning example, not a KEDA minimum quantity or recommended stock level.

Compare that starting quantity with the supplier’s actual minimums and packing multiples. If the required order is larger, show the extra unallocated stock explicitly. Then review the quantity, customer commitments or timing rather than hiding the difference inside a rounded total.

Check that demonstrations are counted once. A pack reserved for a trial should not simultaneously appear as available stock for an unrelated customer order.

6. Budget for Bringing the Range into Use

Review the proposed order as a complete purchasing commitment. Alongside product prices, identify the applicable packing, freight, handling, destination and local delivery costs. Use confirmed quotations and actual arrangements for the relevant items.

Separate known amounts from estimates. Where a cost remains open, record who will confirm it and which decision depends on it. Avoid treating an incomplete freight estimate as a final delivered cost.

Include the resources needed to introduce the range: agreed demonstrations, customer visits, storage arrangements and staff preparation. These activities may be part of the first-order plan even when they are outside the supplier’s invoice.

Compare payment dates with expected receipts from customers. If customer quantities remain tentative, keep that uncertainty visible when deciding how much stock to purchase. A potential sale is not the same as a payment available to fund the order.

Evaluate a larger quantity against the stock it adds, not just the price reduction it offers. Ask which customers would use the extra units and when the decision will be reviewed. That creates a more useful comparison between a narrow launch and a broader assortment.

7. Confirm What a Mixed Order Actually Includes

KEDA’s distributor and partner information allows discussion of combined product lines. Share the proposed quantities and packaging for each item so the actual configuration can be reviewed.

Confirm minimum quantities at the relevant level. Ask whether a minimum applies to the overall order, a product, a color, a pack configuration or a packaging arrangement. Do not infer that combining lines removes every item-level requirement.

Keep brand scope clear. KEDA’s marble, epoxy structural and epoxy slab adhesive ranges are supplied under the KEDA brand. Customer-brand arrangements for eligible other lines are a separate discussion, subject to the applicable order conditions.

Agree the schedule for the actual mix, including any item that may delay the proposed shipment. Clarify production readiness, shipment arrangements and expected availability separately before setting customer delivery expectations.

Request the actual storage instructions, shelf-life information and required documents for each supplied material. Check whether the proposed stock and introduction period fit those conditions. Receiving goods does not restart a shelf-life period defined from manufacture.

Retain the confirmed item list and open questions with the quotation. Changes to one component or pack configuration should remain visible through order confirmation.

8. Decide How the First Shipment Will Be Reviewed

Set up the review before the goods arrive. Track each product-color-pack line separately, using the same unit definitions as the order. Separate saleable stock, committed allocations and demonstration material in the record.

Review recordWhat it helps you decide
Received units and conditionWhether the delivery matches the agreed order
Customer sales and returnsWhich exact items customers actually bought and retained
Demonstrations and trial outcomesWhich evaluations produced a next purchasing decision
Unfilled requestsWhether demand was missed because of availability, selection or another issue
Free usable stock and reserved unitsWhat remains available for new customers
Replenishment timing and open issuesWhich items need a purchasing decision before supply runs short

Interpret movements carefully. Free samples and internal transfers are not paid sales. A quotation request is not a stockout unless the required item and timing were actually unavailable.

When a line sells slowly, investigate the reason before increasing or discontinuing it. Customer trials, unsuitable pack sizes, incomplete technical answers and weak demand lead to different next actions.

Use actual sales and arrival history to refine the next purchase. As evidence improves, review the quantity and timing by item instead of repeating the first shipment in the same proportions.

Staged distributor stock-review scene with plain cartons and a blank review clipboard.

Generic staged stock-review scene, not KEDA premises, actual inventory or a product-storage specification.

9. Send a First-Order Proposal That Invites a Specific Response

Prepare one proposal containing the destination, sales channels, customer applications and exact order lines. Add the evidence behind each quantity, the evaluations still open and the intended introduction schedule.

For each line, state the product, color, capacity, purchasing unit and requested quantity. Ask the supplier to return confirmed component contents, packing conversion, minimum requirements, pricing basis and schedule against that same list.

Identify alternatives explicitly. If a different capacity or configuration is proposed, review how it changes customer allocations and the total commitment before accepting the revision. Keep one agreed version of the order list.

Contact KEDA with that proposal to discuss the available supply configuration. A clear first order connects identified customers with a manageable range, while leaving enough information to make the second order more accurate.

Frequently Asked Questions

1. Should a new distributor order every available color and pack size?

Start with combinations supported by actual customer needs and evaluations. Add variants when there is a defined selling opportunity and a practical plan for the stock.

2. Can different KEDA products be combined in the first order?

Combined product lines can be discussed. Confirm quantities, packaging, item-level minimums and the shipment arrangement for the actual proposed mix.

3. Is the largest pack always the best opening choice?

Compare it with customer purchasing habits, throughput and container use. Include handling and stock implications alongside the quoted unit price.

4. How should demonstration stock be counted?

Identify its purpose and quantity separately, include it in the purchasing plan and record its use. Keep it distinct from paid sales and uncommitted saleable stock.

5. When should the distributor place a repeat order?

Review actual demand, free usable stock, commitments and confirmed replenishment timing. Decide by item rather than using a fixed calendar interval for the entire range.

LET’S TALK ABOUT YOUR REQUIREMENTS